Hillside family house
- Area
- 240 m²
- Floors
- 2
- Building time
- 11 months
- Handed over
- 2025
Two storeys on a steep plot, with a retaining wall, a terrace over the slope and floor heating.
Projects
Finished houses and buildings, and the sites we are working on right now – with the real figures.
Two storeys on a steep plot, with a retaining wall, a terrace over the slope and floor heating.
Under construction
42 flats around a green courtyard, underground parking and a playground on the roof of the garage.
Finished
A 120-year-old brick house with new beams, a restored facade and modern flats inside.
Open floors, a glass facade with sun protection and a café on the ground floor.
Four homes with gardens, heat pumps and solar panels on the roofs.
A former bank hall turned into a bakery with a café – finished in three months, during the summer break.
No project matches both filters.
Tell us what you have in mind – we visit the site and send a fixed offer within a week.