Projects

Built and under way

Finished houses and buildings, and the sites we are working on right now – with the real figures.

Finished

House · Garden district

Hillside family house

Area
240 m²
Floors
2
Building time
11 months
Handed over
2025

Two storeys on a steep plot, with a retaining wall, a terrace over the slope and floor heating.

Linden Court apartments Under construction

Apartment building · New town

Linden Court apartments

Area
4 800 m²
Floors
7
Building time
26 months
Handover
2027

42 flats around a green courtyard, underground parking and a playground on the roof of the garage.

Old town house, renovated Finished

Renovation · Old town

Old town house, renovated

Area
320 m²
Floors
3
Building time
9 months
Handed over
2024

A 120-year-old brick house with new beams, a restored facade and modern flats inside.

Finished

Commercial · River bank

Riverside office building

Area
2 600 m²
Floors
5
Building time
16 months
Handed over
2023

Open floors, a glass facade with sun protection and a café on the ground floor.

Under construction

House · Lake road

Two semi-detached houses

Area
520 m²
Floors
2
Building time
10 months
Handover
2026

Four homes with gardens, heat pumps and solar panels on the roofs.

Finished

Renovation · Main street

Shop floor conversion

Area
410 m²
Floors
1
Building time
3 months
Handed over
2025

A former bank hall turned into a bakery with a café – finished in three months, during the summer break.