Process & costs

How your building rises

Six phases with clear weeks – then estimate the costs for your project.

  1. 1

    Planning & permits

    Site visit, design, structural calculations and the building permit.

    Weeks 1–6

  2. 2

    Ground works

    Surveying, excavation, foundations and connections to water and power.

    Weeks 7–9

  3. 3

    Shell

    Walls, ceilings and stairs – the building gets its shape floor by floor.

    Weeks 10–21

  4. 4

    Roof & facade

    The building is closed: roof, windows, insulation and facade.

    Weeks 22–27

  5. 5

    Installations

    Heating, plumbing, ventilation and electrics, checked before the walls are closed.

    Weeks 28–33

  6. 6

    Finishing & handover

    Plaster, floors, tiles and paint – then a joint walk-through and the keys.

    Weeks 34–41

Cost estimate

Choose the type of project, the area and the finish – you get a price range per square metre from our last projects.

A first orientation without land, design fees and permits. The fixed price follows after the site visit.

Finish
Estimated cost–
Request a quote with this